Yi Ann Electrical Engineering added 3 new photos in scenarios Kiara condo, Taman Sri Sinar (#install lighting)
Dec 14, 2020 at 03:13 pm —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added 2 new photos in Setapak PV16 (#install sub meter for air condo)
Dec 14, 2020 at 02:57 pm —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added 2 new photos in Setapak residensi platinum teratai (#install sub meter)
Dec 4, 2020 at 12:28 am —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added 6 new photos in Kiaramas Ayuria mont Kiara (#checking short circuit wiring)
Dec 4, 2020 at 12:24 am —
Yi Ann Electrical Engineering added 2 new photos in USJ 18 (#checking and replace door bell and switch)
Dec 4, 2020 at 12:19 am —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added 3 new photos in Avelon Tower Manjalara Kepong (#install heater wiring and lighting)
Dec 4, 2020 at 12:17 am —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added 2 new photos in Camellia service suite Bangsar south (#checking wiring and install air cond switch)
Dec 4, 2020 at 12:14 am —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added 3 new photos in Alam nusantara (#install chandelier light)
Dec 4, 2020 at 12:10 am —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added 4 new photos in Paloma serviced residences (#install pendent light and point)
Nov 25, 2020 at 03:17 pm —
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering
Yi Ann Electrical Engineering added new photo in Jalan Plumbum 7/101E (#install sub meter)
Nov 23, 2020 at 05:14 pm —
Yi Ann Electrical Engineering
next page